Skip to content

A few weeks remain before the frost. It is the last window to seal, repair or pave before winter goes to work on open cracks.

Free quote
Sealer being applied to a residential asphalt driveway
Service · Asphalt sealcoating

Asphalt sealcoating:
protect your driveway from water, salt and sun, and get back that first-day black

A protective coat applied to a prepared surface, blocking what wears asphalt down and giving it back its new look.

The problem

Your driveway is turning grey, water no longer beads on it, hairline cracks are appearing. It’s not a structural problem yet, but it’s the doorway to the next one. De-icing salt, oil and UV attack asphalt from the first year, and a surface that’s no longer protected ages much faster than a sealed one.

Sealer forms a protective barrier that slows oxidation, keeps water from seeping into hairline cracks and gives your driveway back its deep black.

We prepare the surface (cleaning, crack filling, treating oil stains) before applying a commercial-grade sealer in one or two coats depending on the condition of the asphalt.

Ideal for

  • Recent asphalt driveway (first protection)
  • Greyish, dull asphalt
  • Commercial parking lots (regular maintenance)
  • After a repair, to even out the look

What changes the price

No price per square foot here: it depends on what we find during the visit. Here is what really moves your quote.

  1. The area to cover, measured on site.

  2. The number of coats needed: a surface that’s still black and tight needs fewer than one that’s grey and porous.

  3. The preparation: how many cracks to fill, oil stains to treat, how much cleaning is needed.

  4. Access and the shape of the driveway: edges, curves and transitions take more squeegee work.

Everything that affects the price of paving

The mistakes we often see

  • Sealing new asphalt too soon: it hasn’t finished curing, and the sealer traps the oils instead of protecting.
  • Applying it to a dirty or damp surface: the sealer doesn’t bond and peels off in sheets by the following winter.
  • Sealing over open cracks without filling them: water keeps getting in, under a nice black coat.
  • Driving on it before it has finished drying: permanent tire marks.
What you gain

The concrete benefits.

  • You push back the next big expense

    Sealer applied at the right time, on a prepared surface, slows oxidation and water infiltration, the two causes that lead to reconstruction.

  • Your driveway looks new by the next day

    Deep, uniform black: the difference shows from the street, and it’s the first thing a visitor (or a buyer) notices.

  • Done properly, not just “rolled on” over top

    Cleaning, crack filling, oil stain treatment, then one or two coats depending on the condition. Sealer applied to a dirty surface peels within a winter; ours goes on a surface that’s ready.

  • Fast and affordable

    One day of work, ready to use the next day.

How it goes

How we proceed, step by step.

  1. 1

    Surface cleaning (blowing, brushing, degreasing)

  2. 2

    Crack filling and oil stain treatment

  3. 3

    Sealer application (1 or 2 coats) by squeegee or sprayer

  4. 4

    Drying 24 to 48 h, then back in service

Service areas

Same method, same written quote, same crew, from the island of Montreal to the North Shore and the South Shore.

Your city is not on the list? See all our service areas or describe your project: we will quickly tell you if we come to your area.

Frequently asked questions

About this service.

How often should sealer be applied?

Every 3 to 5 years for a residential driveway, more often for a high-traffic parking lot.

Can a new driveway be sealed right away?

No: you need to wait 6 to 12 months for the new asphalt to finish curing before the first application.

Does sealer make asphalt slippery?

A commercial-grade sealer, applied correctly, doesn’t make the surface slippery once dry. We choose the product for your driveway and specify it in the quote.

How long before I can drive on it?

Allow 24 to 48 h of drying depending on temperature and humidity before parking a car on it. We confirm the exact wait on the day of application, and we advise against turning the wheels while stopped for the first few days.

Advice
All advice

Other services

Free quote

Let’s talk about your project.

Describe your project in two minutes. The owner calls you back to set up a visit, measure, assess the base, and hand you a detailed quote, free and with no obligation.

  • Free visit and measurement
  • Firm price, itemized step by step
  • Written warranty in the quote
  • Quick callback, on business days
438 220-0849

What your quote includes

  • Area measured on site
  • Excavation and removal of the old surface
  • Crushed stone base compacted in layers
  • Asphalt thickness and compaction method
  • Drainage, slopes and transitions
  • Finishing and site cleanup
  • Written warranty and its terms

Line by line, comparable with any other quote.

No salesperson, no pushy follow-ups: the owner calls you back, on business days, to schedule the free visit. Your contact details are used to answer your request and to measure the effectiveness of our advertising, and are never sold.