Skip to content

A few weeks remain before the frost. It is the last window to seal, repair or pave before winter goes to work on open cracks.

Free quote
Frequently asked questions

Everything about asphalt paving.

What drives the price, the best time of year, how long the work takes, the warranty, sealer, asphalt or paving stones: 31 answers, straight up. Still have a doubt? Describe your project, we call you back.

Answers from a contractor

Paving, prices, warranty, maintenance.

Every answer is the one we would give you on the job site. No figure here is a promise: every project is assessed on site.

How much does an asphalt driveway cost in Quebec?

The price depends on the surface area, the condition of the base and access to the site. A full reconstruction costs more than resurfacing, which costs more than sealcoating. We give you a written, detailed quote, free and with no obligation, after an on-site visit. The six factors that make the price vary are explained on our Asphalt Paving Prices page.

When is the best time to pave in Quebec?

From May to November, as long as the ground temperature lets hot asphalt compact properly. The schedule fills up in the order quotes are accepted: asking for yours early gives you the choice of date.

How long does it take to pave a driveway?

Most residential driveways are paved in a single day. If a new foundation is needed, count on one day of preparation, then paving in the following days.

Do you offer a warranty?

Yes. Our paving work is guaranteed against installation and material defects. The terms of the warranty are written in black and white in your quote, not said over the phone.

Asphalt or paving stones: which should you choose?

Asphalt costs considerably less to install, goes down in a day and is easy to repair. Paving stones offer more design options but cost considerably more to install and need their joints maintained. For a durable, affordable driveway in Quebec, asphalt remains the most popular choice.

Which cities do you serve?

Montreal, Laval, Terrebonne, Mascouche, Repentigny, Blainville, Boisbriand, Sainte-Thérèse, Rosemère, Lorraine, Bois-des-Filion, Saint-Eustache, Mirabel, L’Assomption, as well as Longueuil and Brossard on the South Shore.

Do I need a permit to redo my driveway?

It depends on the city and the project. Many cities require a permit or a certificate of authorization to build, modify or enlarge a parking area, and several also regulate curb and sidewalk cuts. In Mirabel, for example, a residential parking area does not need one but cutting the curb does; in Lorraine, paving a driveway falls under a certificate of authorization. Confirm your case with your City before you sign: each city page summarizes what its City says and links to its official page.

When should you apply sealer to a new driveway?

About 6 to 12 months after paving, once the new asphalt has finished curing, then every 3 to 5 years depending on use. Sealing too early traps the oils instead of protecting the surface.

How thick are the asphalt and stone layers you install?

Generally 6 to 8 inches of compacted crushed stone and 2 to 3 inches of compacted asphalt for a residential driveway; more for a commercial parking lot or an area with truck traffic. The thicknesses planned for your project are written in the quote: after compaction, not “as laid”.

How long before I can park on my new driveway?

We recommend waiting 3 to 5 days in hot weather before parking a car on it, and avoiding turning the wheels while stopped for the first few weeks.

How long does an asphalt driveway last in Quebec?

It depends first on the foundation, the drainage and the maintenance. A driveway built on a base compacted in layers, with proper slopes and sealer applied at the right time, gets through many winters; a driveway laid on a thin base cracks within the first few. During the visit, we explain what your base allows.

Does the old asphalt need to be removed, or can you pave over it?

If the base is sound, resurfacing over it is possible and more economical. If the driveway is sunken or badly cracked, we rebuild the foundation. We tell you honestly which of the two options is right for you.

Can you pave over a gravel driveway?

Not directly. The gravel of a temporary driveway is rarely thick enough or compacted enough to serve as a foundation. We check what’s in place, top up or rebuild the base with compacted crushed stone, then pave. That’s what keeps you from redoing the work a few years later.

Do I need a permit to widen my driveway?

It depends on the city and the project. Many cities require a permit or a certificate to build or modify a parking area, and to create a curb cut or touch the sidewalk or curb. Rules vary from one municipality to the next (and from one borough to the next in Montreal): your city page summarizes what its City says, and we tell you where to check before you start.

How do you keep my parking lot accessible during the work?

We divide the lot into zones and work one zone at a time, keeping the main access points open. The order of the phases, the days and the hours are agreed with you and written into the schedule before day one, so you can notify your tenants or your customers.

Will the repair show?

A repaired section is visible at first (darker asphalt), then blends in over time. Sealcoating the whole surface evens out the colour.

At what point should I redo instead of repair?

When the damage is spread over a large part of the surface, or the base is sinking in several places, redoing generally becomes more cost-effective than piling up repairs. That’s what we assess on site, and we give you both options in writing.

Do you repair cracks before winter?

Yes, as long as the temperature allows. Closing a crack in the fall keeps water from getting in and freezing over the winter: it’s the most cost-effective repair of the year. Past a certain cold, we postpone to spring rather than do work that won’t hold.

Does a cold-patched pothole hold up?

Rarely beyond one season. Cold asphalt is a temporary fix that doesn’t bond with the surface around it. Our method (clean saw cut, recompacted base, hot-mix asphalt, sealed joints) treats the cause and makes the repair last.

How often should sealer be applied?

Every 3 to 5 years for a residential driveway, more often for a high-traffic parking lot.

Can a new driveway be sealed right away?

No: you need to wait 6 to 12 months for the new asphalt to finish curing before the first application.

Does sealer make asphalt slippery?

A commercial-grade sealer, applied correctly, doesn’t make the surface slippery once dry. We choose the product for your driveway and specify it in the quote.

How long before I can drive on it?

Allow 24 to 48 h of drying depending on temperature and humidity before parking a car on it. We confirm the exact wait on the day of application, and we advise against turning the wheels while stopped for the first few days.

Does resurfacing last as long as a new driveway?

On a sound base, a resurfacing done right (tack coat, hot-mix asphalt, roller compaction) performs like a new surface. On a sunken base, it won’t last: that’s why we always assess the base before proposing it.

Does it raise the level of my driveway?

Yes, by about 1.5 to 2 inches. We handle the transitions with the garage, the sidewalk and the street for a smooth result.

Does resurfacing fix sunken spots?

No. A sunken spot comes from the base, and a new layer on top doesn’t repair it: the dip comes back. A minor sunken spot can be corrected locally before resurfacing; multiple sunken spots mean the foundation has to be rebuilt. We tell you clearly during the visit.

What do you do at the transition with the garage?

The new layer is gradually tapered as it approaches the threshold to avoid a step, or the old surface is milled across the width of the transition. Same thing at the sidewalk and the street. The result: a smooth transition, with no lip to catch the shovel or hold water.

How thick does the foundation need to be?

Generally 6 to 8 inches of compacted stone for a residential driveway, 10 to 12 inches and more for a commercial parking lot, depending on the soil and the load.

How long does the excavation take?

A standard residential driveway is prepared in one day; paving generally follows within the next few days.

What happens to the old asphalt?

It’s loaded and hauled to an authorized site where it’s recycled: asphalt gets reused. Concrete and soil are disposed of the same way, by the rules. Removal is included in the quote, not billed as an extra.

Do utility lines need to be located before digging?

Before any excavation, gas, electrical and telecommunications lines must be located; the request is made to Info-Excavation. Also point out your private services (drain, irrigation, lighting) during the visit.

Free quote

A written price, not an estimate over the phone.

Describe your project in two minutes. The owner calls you back to set up a visit, measure, assess the base, and hand you a detailed quote, free and with no obligation.

  • Free visit and measurement
  • Firm price, itemized step by step
  • Written warranty in the quote
  • Quick callback, on business days
438 220-0849

What your quote includes

  • Area measured on site
  • Excavation and removal of the old surface
  • Crushed stone base compacted in layers
  • Asphalt thickness and compaction method
  • Drainage, slopes and transitions
  • Finishing and site cleanup
  • Written warranty and its terms

Line by line, comparable with any other quote.

No salesperson, no pushy follow-ups: the owner calls you back, on business days, to schedule the free visit. Your contact details are used to answer your request and to measure the effectiveness of our advertising, and are never sold.